Inspiration I have the opportunity to study this little insect and discover that they are distinct behaviors. The wealth of wisdom I saw with the soldier-ant was something that I needed to tap into. I saw teamwork, tenacity, resilience and determination in my study and I feel doing a game on that will be great
What it does This epic game mimics the soldier ant colony as each colony fights for food. Colonies go in search of food and can engage other colonies in a battle to get food already collected by another colony. This battle can sometimes bring some colonies to extinction
How we built it the smart contract was built and deployed to the TrustEVM, Next JS was used for the user interface, NFT characters were designed and deployed.
Challenges we ran into Creating blockchain games was something new to me. calling chainlink randomness to get make the game non-deterministic was not easy. the random transaction keeps pending but it paid off at last. Still thinking about how to make it a multiplayer game.
Accomplishments that we're proud of I don't know that I can implement one of my passive studies into a game. The idea came in a flash and I wish to take this game further. I am enjoying every bit of this adventure.
What we learned I learned chainlink randomness, fluence, and some new technology that I have not used before in web3
What's next for Soldier-Ant Colony Beta testing, more soldier ant NFT collection, Launch on Mainnet, Metaverse 3D,