Build Week engineering log — July 13
Retrospective post; the linked Git history preserves the original timestamps.
We started Build Week by turning LoopSkill from a large prompt concept into a governed workflow system. Two major merges landed:
- human-steerable, convergence-aware Loop behavior with explicit evidence and stop conditions;
- the Intake Gate, which separates
READY_FOR_LOOP, clarification, hard blockers, and work that is better handled as a direct task.
This established the core product idea: long-running Codex work should begin with a validated contract covering scope, roles, permissions, budgets, review evidence, bounded repair, and explicit finalization.
Timestamped evidence: merge 09dfc9b and merge 26f137c.
Log in or sign up for Devpost to join the conversation.