Kayakalp — Predictive Material Control Tower for Construction Track: Track 2 — Supply Chain

The problem On every construction project, once materials are ordered, chaos begins. The same five questions get asked daily and nobody can answer them reliably:

What's been approved? What's being fabricated? What's delayed? Where is it now? Will it arrive when the project needs it?

The data needed to answer them is real but scattered across POs (PDF), submittal logs, supplier emails, WhatsApp photos from fab shops, delivery tickets, and the project schedule (Primavera P6 / MS Project). Because no system fuses these, a slipping order is discovered after the crew is already standing idle. Small material delays cascade along the critical path into missed milestones and blown budgets. Construction is one of the world's largest industries and among the least served by software — this gap is exactly why.

The solution Kayakalp is a material control tower: an AI system that ingests the scattered signals, fuses them into a live Material Knowledge Graph, predicts each material's arrival as a calibrated probability, simulates the schedule impact of any slip, and then acts to prevent it. It answers the five questions on one screen and, critically, tells the team what to do right now — ranked by cost of delay. Three design choices make it adoptable where past tools failed:

Ingest by forwarding an email inbox — no manual data entry. Update by photo — a foreman's phone picture updates status via a vision‑language model, no forms. Ask in plain language — on web or WhatsApp, zero training.

How it works (and why it's more than an API call)

Ingest & extract. Emails, POs, submittals, drawings, delivery tickets, and the schedule flow in. Document intelligence (ColPali visual retrieval + Docling extraction) turns messy PDFs and drawings into structured, linked facts. Understand the site. Qwen2.5‑VL reads job‑site photos/video and delivery tickets, auto‑updating fabrication and delivery status and flagging spec mismatches — no data entry. Predict. A probabilistic time‑series + survival model (Chronos/Lag‑Llama) forecasts each material's arrival distribution; conformal prediction yields a calibrated interval. Simulate the cascade. The ETA is propagated through the schedule modeled as a critical‑path DAG, producing the true downstream impact and cost‑of‑delay. Act. A LangGraph agent drafts the supplier escalation, proposes a schedule re‑sequence, and flags spec issues — human approves with one click; the agent then executes and writes results back to the graph.

The Core Loop

AI techniques applied

  1. Vision‑Language Models — understand, not just detect. We use Qwen2.5‑VL to reason about job‑site conditions, not draw boxes. A photo of the fab shop returns: "3 of 8 steel columns fabricated; 2 show incorrect weld prep vs. detail S‑204." It reads delivery tickets and packing slips from a phone photo, watches a short site video to confirm a crane is staged, and cross‑checks installed work against the drawing. Understanding site state → automatic status, zero forms.

  2. Document Intelligence — beyond OCR. Construction docs break OCR: multi‑page submittals, dimensioned drawings, revision clouds, approval stamps, spec sections. We apply ColPali/ColQwen2 visual retrieval — embedding the page image — so "find the approved submittal and rebar grade for grid B‑4" returns the exact drawing region, spec clause, and stamp status. We extract structured fields (SKU, qty, promised date, spec compliance) via Docling/GOT‑OCR2.0 as a typed fallback. This is the technique competitors won't have.

  3. Forecasting & Optimization — probabilistic, calibrated, actionable. Per material we fit a time‑to‑delivery hazard and forecast with a pretrained probabilistic TS model (Chronos/Lag‑Llama) using supplier history, lead‑time class, fab progress, and logistics signals. Conformal prediction gives a trustworthy interval. Then an optimizer acts on it: reorder priority, alternate‑supplier swap, or a schedule re‑sequence that minimizes critical‑path slip subject to crew/space constraints.

  4. Agentic Systems — it takes action. A LangGraph tool‑calling agent retrieves docs (RAG), reads the graph, drafts and (on approval) sends the supplier escalation, proposes the re‑sequence to the scheduler, and can place the call/message to the vendor. Question → prediction → action, with a human‑approval gate on anything external.

  5. Construction‑Specific AI RAG grounded on this project's spec book, SKU catalog, submittal log, and approved vendor list, plus a construction ontology (CSI MasterFormat divisions, submittal states, lead‑time classes). Optional LoRA fine‑tune on construction language so "IFC," "long‑lead," "RFI," "backcharge," and "float" mean the right thing. Answers are project‑specific and spec‑grounded, never generic.

The techniques nobody else will apply

ColPali / ColQwen2 visual-document retrieval over drawings— RAG over the pixels of a drawing instead of the standard OCR → chunk → embed pipeline that destroys drawings, tables, stamps, and dimension callouts. Conformal-calibrated probabilistic / survival ETAs— trustworthy prediction intervals, not point guesses. Delay-cascade propagation on the schedule DAG — predict the domino effect through the critical path, priced in $.

Open-source model stack

Qwen2.5-VL — job-site photos, drawings, video, grounding / bounding boxes. ColQwen2 — visual document retrieval. Docling / GOT-OCR2.0 — structured extraction fallback. Chronos-Bolt / Lag-Llama — probabilistic ETA foundation models. Llama-3.3-70B or Qwen2.5 — agent planner with tool-calling via LangGraph.

Why now Open-source VLMs (Qwen2.5-VL, InternVL), visual-document retrievers (ColQwen2), and probabilistic TS foundation models (Chronos) crossed the accuracy/cost threshold in 2024–25 that finally makes passive, messy site data machine-readable and predictable — cheaply enough to run per project. Data can stay on-prem with the general contractor

Impact Fewer idle crews, earlier delay warnings, protected milestones, and lower cost — by turning material chaos into a predictive, self-acting timeline. .

Nitesh Patel - IIT Bombay Satwik Soni - IIT Bombay Pushkar Yadav - IIT Bombay