CueNexa Loop — Shipathon Project Update
Current Status
CueNexa Loop is now in HOLD-CONTEST-STABLE mode.
The core product work, live Bee validation, Electron integration reference, and developer documentation are complete. The project is intentionally stable while the contest entry is active.
No new feature development is currently authorized.
What Has Been Completed
Core CueNexa Loop
- Phase 0 — Foundation and Bee integration: CLOSED
- Phase 1A — Deterministic LoopItem detection: CLOSED
- Phase 1B — Cross-conversation correlation: CLOSED
- Phase 2 — Local persistent follow-through: CLOSED
- Phase 3 — Review, attention, user state, and notifications: CLOSED
- Phase 4 — Ambient realtime awareness: CLOSED
- Phase 4 live Bee acceptance: PASSED
The core architecture remains:
Bee conversations
↓
Processed Bee history
↓
Deterministic detection
↓
Cross-conversation correlation
↓
Local persistent LoopThread
↓
Review / follow-through workflow

Log in or sign up for Devpost to join the conversation.