Inspiration- Failure
What it does- Enhanced improve TO FUTURE.
How we built it
Challenges we ran into- Failure to Failure then unsucessful, then last time sucessful, time calculation problem, everybody was called it's practically impossible but we provded that it's practically possible.
Accomplishments that we're proud of- It has been proved that practically this project can be implement by comparing the train speed time.
What we learned- If an work has a 0.001% chance then that work should definitely be taken continue.
1. Enhanced passenger safety.
- Increased operational efficiency.
- Automated gate control.
- Real-time monitoring and alerts.
- Reduced manpower.
- Improved passenger experience.
- Increased transparency and accountability. 8. Scalable and adaptable design.
It's next for Advanced Network Based Railway Gate Control and Monitoring System.
Log in or sign up for Devpost to join the conversation.